5 reporting a problem, 6 corrective actions, 7 recommended test equipment – Liebert Series 600T User Manual

Page 122: Table 5 recommended test equipment and tools, Reporting a problem, Corrective actions, Recommended test equipment, Table 5, Recommended test equipment and tools

Advertising
background image

116

Maintenance

4.5

Reporting a Problem

If a problem occurs within the UPS, review all alarm messages along with other pertinent data. This information
should be given via telephone to the Liebert Field Service Regional Office nearest you. This information can also
be automatically sent by telephone modem. Call 1-800-543-2378 or your nearest LGS office to report a problem
or to request assistance.

4.6

Corrective Actions

For each alarm message on the Operator Control Panel and the Remote Monitor Panel, you can find the recom-
mended corrective action in Table 1 of 3.0 - Operation.

4.7

Recommended Test Equipment

A list of recommended test equipment and tools required to maintain, troubleshoot, and repair the UPS module is
given in Table 5.You may substitute instruments of equivalent range and accuracy. All instruments should be
calibrated and be within the current calibration cycle. Calibration data for the instruments should be maintained
in historic files and the instruments labeled for audit and verification.

Table 5

Recommended Test Equipment and Tools

Quantity

Test Equipment

Manufacturer

Model or Type

1

Oscilloscope

Tektronix, H-P or
Fluke

DC to 50 MHz

2

Voltage Probes

Tektronix, H-P or
Fluke

10X, with 10 ft Cable

2

Voltage Probes

Tektronix, H-P or
Fluke

100X, with 10 ft Cable

1

Digital Multi-Meter

Fluke

8060, with Test Leads

1

Tool Kit

N/A

Standard electrical contractor tools

Advertising