Polaris TBM 200 LH User Manual

Page 50

Advertising
background image




ENGINEERING STANDARD PROCEDURE
IMPELLER INSTALLATION – TECH BULLETIN

1of 1

DOCUMENT NBR. :

PED-017

REVISION:

0

EFFECTIVE
DATE:

09-16-2003



0

NEW

UJB

08-15-02

1

ADDED250LH

UJB

09-26-03

REV ECN CHANGE

DESCRIPTION

BY

APPV’D

DATE

1.0 SCOPE:

Assembly Pre-Load / Bolt Torque requirements for Metric Fasteners of Grades A2-70 (304L)
A4-70 (316L) and 8.8, for Sizes M4 to M20.


2.0 METHOD:


ASSEMBLY TORQUE / ASSEMBLY PRE-LOAD

TIGHTENING TORQUE

ASSEMBLY PRE-LOAD

SIZE CLASS

Nm lb/ft

[lb/in] kN

lbf

M4 2.20

1.622

[19.46]

2.73

612.23

M5 4.20

3.097

[37.16]

4.47

1002.44

M6 7.40

5.45

[65.40]

6.31

1415.08

M8 17.80

13.12

11.60

2601.42

M10 36.00

26.54

18.40

4126.40

M12 62.00

45.72

26.90

6032.62

M16 150.00

110.62

50.90

11414.88

M20

A2-70, A4

-7

0,

8.8

303.00 223.45 82.00

18389.40

ABOVE TORQUE / PRE-LOAD VALUES ARE BASED ON A COEFFICIENT OF FRICTION OF 0.14 (Anti-seize Lubricant)

Advertising