With the openings in the fco. see figure 4-9, Figure 4-9 – Qualstar 501440 Rev. G User Manual

Page 24

Advertising
background image

Bottom Edge of

Service Panel Opening

Heatsink Panel

Screws (4)

Executive PCBA

Screw Holes (6)

FCO’s

Hinges (2)

Fibre Channel

Option

Captive Screws (4)

Figure 4-9 Rear View of TLS

6.

Loosen the two top captive screws on the FCO that were tightened in step num-
ber four. Carefully guide the FCO backwards as it pivots on the hinges and
comes to its open position. See Figure 4-10.

FCO in Open Position

Figure 4-10 Fibre Channel Option in the Open Position

7.

Connect the AUXPWR cable to the AUXPWR connector on the Executive PCBA
and to the PWRIN connector on the Fibre Channel Option. See Figure 4-11 and
Figure 4-13.

501440 Rev. J

FCO Type C Installation

4-11

Advertising