Repacking 9-5 – Qualstar 501440 Rev. G User Manual

Page 80

Advertising
background image

AC Power Receptacle

Power Switch

SCSI 0

SCSI 4

SCSI 2

SCSI 1

SCSI 5

SCSI 3

SERIAL

FAIL OVER

ETHERNET

FIBRE CHANNEL 0

FIBRE CHANNEL 1

SCSI 0

LED

SCSI 4

LED

SCSI 2

LED

SCSI 1

LED

SCSI 5

LED

SCSI 3

LED

AT LED 1

(Fibre Channel 1)

LK LED 1

(Fibre Channel 1)

AT LED 0

(Fibre Channel 0)

LK LED 0

(Fibre Channel 0)

ST LED

(Ethernet)

LK LED

(Ethernet)

ST LED

FT LED

Figure 9-5 Rear View of the Type B Fibre Channel Bridge/Router (FCO)

1.

Remove power from the FCO: first turn the power switch off and then remove the
power cord.

2.

Remove power from the TLS: first turn the power switch off and then remove the
power cord.

3.

If the FCO is connected the FC host or Hub, disconnect it.

4.

Disconnect any SCSI cables (SCSI 0 through SCSI 5) from the rear of the FCO.

5.

Disconnect the cable from the serial connector on the FCO.

6.

If the FCO is mounted in a rack, cabinet or other location detach it and it will be
ready for packing.

9.4

Preparation for Packing ATTO Fibre Channel Options

CAUTION

Be sure to turn the library’s power off before installing or removing a Fibre Chan-

nel Option.

501440 Rev. J

Repacking 9-5

Advertising