Tighten the nuts (2)/(6) and (3) to the correct tightening torque. Refer to the section
'Recommended tightening torques'.

B

A

c_nab2b

0,1-0,2 mm

0,1-0,2 mm

6.5.2

Curved beam, when two trolleys

c_nab3a

2. Adjusting nuts for flange width
3. Trolley positioning nuts
4. Frame tube
5. Trolley side plate

• Remove the temporary transport supports. Take the hoist out of the packing and move it to the

installation site. Lift the hoist using the lifting lugs provided.

• Loosen the tightening nuts for flange width (2). Adjust the distance between the travel wheels (A) so

that it is slightly wider than the beam flange (B) for installation purposes by turning the screws (3). If
necessary, open also the screws (4).

• Lift the hoist onto the beam.