1 major update history (only in english) – R&M Materials Handling WIRE ROPE HOISTS Service User Manual

Page 5

Advertising
background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

5/130

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

1 Major update history (only in English)

Section Description

Date

Handled

by

Hook operated control
limit switch

Construction of hook operated control limit switch
added.

26.8.2004 KHHJII

Second brake

Construction and service of second brake, brake
release and manual crank added.

23.9.2004 KHHJII

Rope guide

Construction of rope guide added (ø 608 mm).

9.12.2004

KHHJII

Lubricant volumes, travel
gears

Lubricant volumes for larger trolley gears added. 11.1.2005

KHTJPU

Wire rope

Rope inspection criterions changed (minimum
wire brakes).

13.1.2005 KHHASI

Drum brake

Construction and service of drum brake added.

28.2.2005

KHHJII

Installation of normal
headroom trolley

Installation instructions for normal headroom
trolley added (Drum size 608 mm).

20.4.2005 KHHJII

Installation of double
girder trolley

Checks of trolley buffers during installation
added.

10.5.2005 KHJII

Rope drum service

Check of free rotation. Replacement of axial
locking part. (Drum size 303/355/406 mm)

10.5.2005 KHHASI

Recommended
tightening torques

Replacement of self locking nuts (Nyloc).

10.5.2005

KHHASI

Maintenance interval
table

Inspection interval of hoisting machinery and
coupling changed. Inspection interval for drum
brake added.

10.5.2005 KHHJII

Hoisting machinery,
service

Inspection and replacement of coupling clarified. 10.5.2005

KHHJII

Trolley buffers

Trolley buffer inspection instructions added.

10.5.2005

KHHJII

Wedge housing,
assembly

Replacement of split pin.

18.5.2005

KHHJII

Lubricants

Lubricant type for couplings changed.

25.5.2005

KHTJPU

Commissioning

Inspection of rope anchorage

13.9.2005

KHHJII

Lubricants

Lubricant type and volumes for hoisting gears
(GEN4) changed.

21.9.2005 KHTJPU

Rope anchorage

Drawings updated.

29.9.2005

Hook-block, rope reeving
and return sheaves

Hook forging dimensions updated.

5.10.2005

Installation, Normal
headroom trolley

Straight beam heading added. Curved beam
instructions added.

9.12.2005

Hoisting motor and brake Hoisting brake details updated.

9.12.2005 KHMJER

Construction, Rope
guide

Drawings updated.

10.1.2006

Construction

- Low Headroom

Trolley Hoist

- Hoisting limit

switch Drum size
243 mm

New hoist size added (drum diameter 243 mm)

13.1.2006

KHHJII

Advertising