R&M Materials Handling WIRE ROPE HOISTS Service User Manual

Page 112

Advertising
background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

112/130

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

• Adjust the side plate (5) of the trolley inwards by turning the screws (3) until there is a gap of

approximately 3…5mm between the flange of the travel wheels and the flange of the beam.

• Adjust the position of the trolley so that the hook is hanging below the centerline of the beam. Lock

the position by tighten the nuts (2).

!

Tighten the nuts (2) and the screws (4) to the correct tightening torque. Refer to the section
'Recommended tightening torques'.

6.5.3 Outfitting the hoist

• Install the power supply. Refer to the section “Connecting the to mains network”.

• Adjust the limit switch for hoisting. Refer to the section “Adjusting hoisting limit switch”.

• Carry out the commissioning inspection and complete the commissioning log. Refer to the section

“Commissioning”.