5.13 Hoisting limit switch Drum size

φ 243 mm


The roller lever limit switch unit for hoisting is located under the drum cover, on the limit switch fixing
plate.

5.13.1 Service

• Check the proper tripping point of lower limit function.

• Check that the locking screws (3) are tight.

• Check the wiring for loose connections.

Assembly

c_zlowli01c

2

3

4

1

1. Hoist limit switch
2. Connection box cover
3. Fixing screws for limit switch
4. Fixing nut


Disassembly:
• Switch OFF the power supply to the hoist.

• Remove the connection-box cover (2).

• Remove the wires from the limit switch connector in the connection-box.

• Remove the fixing screws (3).
• Extract the limit switch (1).

Re-assembly:
• Fit the limit switch carefully in its place, so that the roller lever is in correct position and in front of the

limit switch fixing plate.

• Tighten the fixing screws (3)
• Re-connect the wires.

• Switch ON the power supply to the hoist and check the proper functioning of the limit switch.

!

In many cases it is necessary to re-adjust the limit switch. Be aware of incorrect settings
during testing the operation.