R&M Materials Handling WIRE ROPE HOISTS Service User Manual

Page 42

Advertising
background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

42/130

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

• Turn the screw “S1” so that it will activate just after “S2” (in upwards direction).

c_holiad1b

• Close the connection-box.

5.14.4 Fine adjustment

If maximum height of lift is needed, fine-tune the upper and lower limit of hoisting.

!

Do not the exceed the minimum distances

#

Notice the right direction of adjusting screw rotation

#

Readjust “S1”, if “S2” is fine-tuned

Upper limit of hoisting upwards.

Lower limit of hoisting downwards.

S1. Supervision limit for phase sequence of hoisting (or hoisting safety limit).
S2. Upper limit of hoisting.
S3. Slowdown limit switch for hoisting.
S4. Lower limit of hoisting.


Advertising