7 single phase power connections – R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 5 User Manual

Page 13

Advertising
background image

LM05 SERIES II I&M MANUAL/EN/11.30.2010


13/89

This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2010) R&M Materials Handling, Inc. All rights reserved.

2.7 Single Phase Power Connections

Figure 3. Single Phase Control Box Power Connections


1. Remove the control box cover.
2. Insert power supply through the power cable gland.
3. Make the following connections:

Connect power lead to L1

Connect neutral lead to L2

Connect ground lead to PE

4. Check terminals to insure they are tight.
5. Close the box.
6. Check the hoist operation











Advertising