2 three-phase single-speed voltage changes – R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 5 User Manual

Page 44

Advertising
background image

LM05 SERIES II I&M MANUAL/EN/11.30.2010


44/89

This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2010) R&M Materials Handling, Inc. All rights reserved.

7.10.2 Three-phase Single-speed Voltage Changes:

Proceed as follows:

1. Use a straight slot screwdriver and remove the cap on top of the fuse holder. There is only one cap for

two fuse holders, locations F100 and F101. The fuse is located in the fuse holder with the cap. Place
control circuit fuse into correct fuse holder position depending on supply voltage.

208 volts

position F101

230 volts

position F100

460 volts

position F100


2. Connect hoist motor leads on terminal strip X5 per appropriate single speed wiring diagram.

3. Connect hoist motor brake leads (see panel layouts and wiring diagrams)

208 / 230V (-) brake lead to X7 and (+) brake lead to K21

460V (-) brake lead to K21 and (+) brake lead to K21


4. Consult Motorized Trolley Manual (if applicable)

m

CAUTION: Motorized trolley drives are not voltage re-connectable. Consult the motorized
trolley manual if a voltage change over is required.




Advertising