R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 5 User Manual

Page 48

Advertising
background image

LM05 SERIES II I&M MANUAL/EN/11.30.2010


48/89

This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2010) R&M Materials Handling, Inc. All rights reserved.

7.14 Control Panel Layout – Three Phase – Two-speed Hoist – 575
volts

Table 7. Control Panel (Three-Phase Two-Speed 575v) Parts List

ITEM

DESCRIPTION

L1

HOIST POWER SUPPLY – PHASE 1

L2

HOIST POWER SUPPLY – PHASE 2

L3

HOIST POWER SUPPLY – PHASE 3

PE

POWER SUPPLY GROUND

X1

TERMINAL STRIP ON PRINTED CIRCUIT BOARD

X6

TERMINAL STRIP ON CONTROL TRANSFORMER – NOTE JUMPER CONNECTIONS

BRAKE (-)

BRAKE COIL SUPPLY (NEGATIVE)

BRAKE (+)

BRAKE COIL SUPPLY (POSITIVE)

X23

PUSH BUTTON PLUG CONNECTION

X24

MOTORIZED TROLLEY PLUG CONNECTION

K10

MAIN LINE CONTACTOR

K21

HOIST “UP” CONTACTOR

K22

HOIST “DOWN” CONTACTOR

K25

HOIST TWO-SPEED FAST CONTACTOR

T100

CONTROL TRANS FORMER

F100

FUSE HOLDER POSITION

1U, 2U

MOTOR SUPPLY LEADS

1V

MOTOR SUPPLY LEAD

2V

MOTOR SUPPLY LEAD

1W

MOTOR SUPPLY LEAD

2W

MOTOR SUPPLY LEAD

Advertising