R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 5 User Manual

Page 23

Advertising
background image

LM05 SERIES II I&M MANUAL/EN/11.30.2010


23/89

This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2010) R&M Materials Handling, Inc. All rights reserved.

6.3.3 Procedure to adjust swivel trolley guide rollers


1. Loosen nut “A” (8 plcs).
2. Adjust guide rollers the maximum distance away from beam.
3. Place swivel trolley on beam.
4. Move trolley to curve section of beam.
5. Adjust guide rollers allowing approximately 3/16” (4-5 mm) clearance per side using screw “B.”
6. Tighten nut “A” (8 plcs).

Figure 9. Swivel trolley guide rollers

NOTE: Adjustments should be made with swivel trolley in radius of monorail.

Advertising