Installation, Cps2500d installation, Purpose – GE Industrial Solutions CPS2500D +-190V User Manual
Page 29: Precautions, Safety, Installation tools, 5 installation, 5installation
Advertising
CPS2500D +/-190V Downstream System
Issue 4 January 2008
Installation 5 - 1
5
Installation
CPS2500D Installation
Purpose
CPS 2500D Shelf Installation
Precautions
Observe ESD protection while installing circuit packs
Safety
• Always consider personal safety.
• Make sure the system is properly grounded per the National Electrical
Code and local building codes.
• Remove all metal jewelry before beginning the installation.
Installation Tools
• Wire cutters and strippers
• Heat shrink gun
• Torque wrench (0-240 inch-lb or 28 Nm)
• 5/16 inch (8mm) hex driver
• 10 mm hex driver
• 48 Volt test load
• Digital meter with an accuracy of +/- 0.02%
• Screw Drivers (flat-blade and Phillips)
• ESD wrist strap
Advertising