Install the cps2500d shelf, Cps2500d frame install, Figure 5-2: qs800a frame mounting – GE Industrial Solutions CPS2500D +-190V User Manual
Page 33: Frame mounting screws go here and here
CPS2500D +/-190V Downstream System
Issue 4 January 2008
Installation 5 - 5
Install the CPS2500D Shelf
CPS2500D Frame
Install
Use the following procedure to mount the CPS 2500D shelf into a frame with
mounting holes located on 12.9 inch (328 mm) centers.
Step
Action
1
Locate the 2 mounting brackets, one on each side of the QS800A
shelf; align the holes in the shelf-mounting bracket with the holes in
the mounting frame. See Figure 5-2.
2
Attach the CPS shelf to the frame using 6 screws threaded to match
the holes in the equipment frame. Refer to the table below for Torque
Specifications.
Torque
Hardware
Nm
in-lb
Metric M5
4
35
12-24
4
35
Metric M6
7.3
65
Figure 5-2: QS800A Frame Mounting
1
2
3
4
5
6
7
9
10
ESD
8
QS882A
A
B
OUT
IN
QS882A
A
B
OUT
IN
QS882A
A
B
OUT
IN
QS882A
A
B
OUT
IN
QS882A
A
B
OUT
IN
QS882A
A
B
OUT
IN
QS882A
A
B
OUT
IN
QS882A
A
B
OUT
IN
QS882A
A
B
OUT
IN
QS882A
A
B
OUT
IN
Frame Mounting
Screws Go Here
And Here