Install the cps2500d shelf, Cps2500d frame install, Figure 5-2: qs800a frame mounting – GE Industrial Solutions CPS2500D +-190V User Manual

Page 33: Frame mounting screws go here and here

Advertising
background image

CPS2500D +/-190V Downstream System

Issue 4 January 2008

Installation 5 - 5

Install the CPS2500D Shelf

CPS2500D Frame
Install

Use the following procedure to mount the CPS 2500D shelf into a frame with
mounting holes located on 12.9 inch (328 mm) centers.

Step

Action

1

Locate the 2 mounting brackets, one on each side of the QS800A
shelf; align the holes in the shelf-mounting bracket with the holes in
the mounting frame. See Figure 5-2.

2

Attach the CPS shelf to the frame using 6 screws threaded to match
the holes in the equipment frame. Refer to the table below for Torque
Specifications.

Torque

Hardware

Nm

in-lb

Metric M5

4

35

12-24

4

35

Metric M6

7.3

65

Figure 5-2: QS800A Frame Mounting

1

2

3

4

5

6

7

9

10

ESD

8

QS882A

A

B

OUT

IN

QS882A

A

B

OUT

IN

QS882A

A

B

OUT

IN

QS882A

A

B

OUT

IN

QS882A

A

B

OUT

IN

QS882A

A

B

OUT

IN

QS882A

A

B

OUT

IN

QS882A

A

B

OUT

IN

QS882A

A

B

OUT

IN

QS882A

A

B

OUT

IN

Frame Mounting
Screws Go Here

And Here

Advertising