Unpack the cps2500d shelf, Cps2500d unpack – GE Industrial Solutions CPS2500D +-190V User Manual

Page 30

Advertising
background image

CPS2500D +/-190V Downstream System

5 - 2 Installation

Issue 4 January 2008

Unpack the CPS2500D Shelf

CPS2500D Unpack

The box contains:

• One QS800A Shelf

• One 848744961 Power Cable

• One 848745547 Alarm Signal Cable

• Product documentation

Step

Action

1

Unpack the box.
Inspect the shipping container for any signs of damage. If damage
exists, have the carrier’s representative sign a note acknowledging
the damage.

2

Carefully cut the sealing tape and remove the shelf, cables and
documentation from the carton.

3

Save the shipping package until all parts are operating within
specifications.

Advertising