Unpack the cps2500d shelf, Cps2500d unpack – GE Industrial Solutions CPS2500D +-190V User Manual
Page 30
Advertising
CPS2500D +/-190V Downstream System
5 - 2 Installation
Issue 4 January 2008
Unpack the CPS2500D Shelf
CPS2500D Unpack
The box contains:
• One QS800A Shelf
• One 848744961 Power Cable
• One 848745547 Alarm Signal Cable
• Product documentation
Step
Action
1
Unpack the box.
Inspect the shipping container for any signs of damage. If damage
exists, have the carrier’s representative sign a note acknowledging
the damage.
2
Carefully cut the sealing tape and remove the shelf, cables and
documentation from the carton.
3
Save the shipping package until all parts are operating within
specifications.
Advertising