GE Industrial Solutions Spectra II Series Plug-in and Feeder Busway with BlueCoat Epoxy Insulation System User Manual

Page 21

Advertising
background image

Spectra and Spectra II Series™ Plug-In and Feeder Busway
Installing Dripproof, Splashproof, and Outdoor Busway

19

Installing an End Box
An end box, as shown in Figure 23, is available to
isolate phases and seal the end of a run. The
installation process is as follows:
1. Fasten the isolation joint to the end of the run

with two screws.

2. Assemble the box over the isolation joint but

do not fasten the wireform springs.

3. Loosely assemble the gasketed joint caps to

set the box position to 10 1/4 inches long. Do
not remove the joint cap knockouts.

4. Fasten the springs and then tighten the cap

bolts.

WARNING: Failure to fasten the isolation joint
with screws may result in serious injury or death.

AVERTISSEMENT: Il y a risques de blessures
graves ou même de mort si le joint d'isolation
n'est pas attaché avec des vis.

Figure 23. End box installed on the end of a run.

Advertising