Spectra and Spectra II Series™ Plug-In and Feeder Busway
Busway Maintenance Procedures

28

Check for missing or broken parts, proper
spring tension, free movement, rust or
corrosion, dirt, excessive wear, arc spatter,
sooty deposits, and tracking. Clean or replace
parts as required.

After Seismic event check for proper spring
tension and yielding of spring hanger parts.
Replace parts as required.

Megohm test at 1000 VDC the system before
re-energizing. The resistance should not be
below 1 megohm per 100 feet of busway.


For general instructions regarding handling,
installation, operation, and maintenance or
busway systems rated at 600 volts or less, see
NEMA Publication BU1.

Additional procedures for inspection, thermal
scanning, safety practices, and maintenance are
described in ANSI/NFPA Standard 70B,
"Recommended Practice for Electrical Equipment
Maintenance" available from the National Fire
Protection Association, Quincy, Massachusetts.