GE Industrial Solutions Spectra II Series Plug-in and Feeder Busway with BlueCoat Epoxy Insulation System User Manual

Page 22

Advertising
background image

Spectra and Spectra II Series™ Plug-In and Feeder Busway
Installing Spectra II Series Busway

20

Spectra SeriesTM Busway - Edge wise Outdoor
Elbow Joint


Installation and Maintenance Instructions.

1. Maintain phase alignment using ø side

labels.

2. Do not remove joint attachment screws.
3. Align bus within limits shown in the

installations torque joint bolt to 50 Lb-ft (68
N-M)

4. Set shield in place and align outside edges

with edges of elbow side plates and secure
springs.

5. Important: Insert hole in shield ―Z‖ bracket

over alignment pin on elbow.

6. Attach joint caps:
7. A. Secure joint cap corner with ¼-20 screw

provided

8. B. Torque bolts: 3/8-25 lb-ft
5/16-14-19 Lb-ft
9. Torque ―Set screw‖ to 18-20 inch Lbs then

tighten ―lock nut‖ to joint cap (4) per cap

10. Mega ohm test run before energizing.

Note: 8 – Remove lifting bracket prior to
installing joint shields.











































Figure 24. Edge wise outdoor Elbow Joint






















Figure 25. Edge wise outdoor Elbow Joint asm. Instructions.







Lifting Bracket

See Note # 8

Lifting Bracket

See Note # 8

Advertising