Troubleshooting preparations, Preliminary, Introduction – GE Industrial Solutions GPS 4848_100 Users Guide (single rectifier shelf) User Manual

Page 79: Safety, Tools, 12 troubleshooting preparations, Preliminary 12-1, Introduction 12-1 safety 12-1 tools 12-1

Advertising
background image

Galaxy Power System 4848/100 with 595 Series Rectifiers S1:3 and later

Issue 10 February 2008

Troubleshooting Preparations 12 - 1

12

Troubleshooting Preparations

Preliminary

Introduction

This section provides information needed in preparation for locating and
interpreting visual indicators to help identify problems.

When replacing a part does not correct the problem or visual indicators
do not identify a defective part, notify Lineage Power Technical
Support.

Safety

Review all safety instructions and warnings in the Safety section of the
GPS Installation Guide before troubleshooting the GPS 4848/100.

Warning

Hazardous ac and dc voltages and/or energy are present. Caution
should be exercised. Tools must be insulated to help prevent
accidental contact with live surfaces.

Coordinate all troubleshooting activities with other personnel that
may be working on the system.

Tools

The following tools are necessary in order to troubleshoot the GPS
4848/100:

3/16-inch (5 mm) Allen-head wrench

Insulated hand tools

Calibrated digital voltmeter (DVM)

(0.05% accuracy on dc scale)

ESD wrist strap

Advertising