Mechanical installation, Fluid installation – Burkert Type 8712 User Manual

Page 27

Advertising
background image

27

Installationandcommissioning

Type 8626, 8712

7.6.

mechanical installation

Observe the mounting position shown on the calibration plate or the
calibration protocol.

7.7.

fluid installation

danger

risk of injury due to high pressure in the installation.
• Shut off the gas flow, relief the pressure and drain the pipe

before loosening the process connections.

Select the fluid connections suitable for the maximum flow-rate and
with the optimum pressure loss. There is no minimum upstream piping
length to be observed.
On request, the device may be supplied with the fluid connections fitted.

Warning

Danger from leaks
If flow-rates are low and pressures high, ensure that the system
is sealed to prevent incorrect metering or the operating fluid
from leaking.
• To ensure that the seal is secure, observe the operations

described below.

Install the fittings without subjecting them to any stresses. To seal the
system properly, use fittings with olives.
Use a line with a suitable diameter and a smooth surface.

Cut the line squarely [1] and deburr [2].

1

2

In order, fit the nut [A] and the olive onto the line.

A

B

C

Olive

English

Advertising
This manual is related to the following products: