Teledyne 9060L - Zirconium oxide flue gas oxygen analyzer User Manual
Page 29
Advertising
Percent Oxygen Analyzer
Installation
Teledyne
Analytical
Instruments
29
Figure 3-5: Connections to Probe
3.5 Installation Checklist
Prior to powering up the unit make sure you have:
• Installed the unit correctly
• Checked the probe and welded probe socket for leaks
Once the above checks have been made, you can connect the power
source. Wait approximately 30 minutes for warm up, two hours wait is
best. After that, the instrument is ready for operation.
Advertising