Teledyne 9060L - Zirconium oxide flue gas oxygen analyzer User Manual

Page 29

Advertising
background image

Percent Oxygen Analyzer

Installation

Teledyne

Analytical

Instruments

29

Figure 3-5: Connections to Probe

3.5 Installation Checklist

Prior to powering up the unit make sure you have:

• Installed the unit correctly
• Checked the probe and welded probe socket for leaks

Once the above checks have been made, you can connect the power

source. Wait approximately 30 minutes for warm up, two hours wait is
best. After that, the instrument is ready for operation.

Advertising