Preparation, Site preparation – LiftMaster LA500 Residential / Light Commercial Swing Gate Operator User Manual

Page 12

Advertising
background image

10

PREPARATION

VEHICLE LOOPS

The vehicle loops allow the gate to stay open when vehicles are obstructing the

gate path. Suggested for vehicles 14 feet (4.27 m) or longer. Vehicle loops are

not required but are recommended.

!

!

Entrapment protection devices are required to protect against any entrapment

or safety conditions encountered in your gate application (refer to page 5

for more details). Install warning signs on both sides of the gate.

Gate must be constructed and installed according to ASTM F2200 standards

(refer to page 4). Gate must fit specifications of operator (refer to

specifications).

Proper grounding gives an electrical

charge, such as from an electrical

static discharge or a near lightning

strike, a path from which to dissipate

its energy safely into the earth.

Without this path, the intense energy

generated by lightning could be

directed towards the gate operator.

Although nothing can absorb the

tremendous power of a direct lightning

strike, proper grounding can protect

the gate operator in most cases.

(Inside Property)

Entrapment Danger

Warning Signs

Check national and local

codes for proper depth

SAFETY

GATE

EARTH GROUND ROD

SITE PREPARATION
Check the national and local building codes BEFORE installation.

Conduit must be UL approved for low and high voltage.

CONDUIT

Conduit

Advertising