Power wiring (large metal control box [xlm]), Wiring – LiftMaster LA500 Residential / Light Commercial Swing Gate Operator User Manual

Page 25

Advertising
background image

23

Junction

Box Cover

LARGE METAL CONTROL BOX (XLM)

POWER WIRING (LARGE METAL CONTROL BOX [XLM])

WIRING

CONNECT BATTERIES

1

Unplug the battery connector to the J15 plug labeled BATT(-)(+) DC(-)(+) on

the control board by squeezing the plug and pulling it from the control board.

2

Connect a jumper between the positive (+) terminal of one battery to the

negative (-) terminal of the other battery.

3

Connect the red wire from the J15 plug labeled BATT (+) to the positive (+)

terminal of the battery.

4

Connect the black wire from the J15 plug labeled BATT (-) to the negative (-)

terminal of the battery.

5

Plug the J15 plug into the control board. The control board will power up.

NOTE: You may see a small spark when plugging the J15 plug into the board.

6

Plug the transformer in.

7

Turn ON AC power.

Battery Connector

J15 Plug

Jumper

Black Wire

Red Wire

POWER WIRING (LARGE METAL CONTROL BOX [XLM])

NOTE: Wiring the Large Metal Control Box for 240 Vac will require the optional toroid

transformer kit (refer to Accessories).

1

Turn OFF AC power to the operator at the circuit breaker and unplug the

transformer.

2

Run the AC power wires to the control box.

3

Remove the junction box cover.

4

Connect the green wire to the earth ground rod wire using a wire nut.

5

Connect the white wire to NEUTRAL using a wire nut.

6

Connect the black wire to HOT using a wire nut.

7

Replace the junction box cover. Ensure the wires are not pinched.

Advertising