Maintenance, Maintenance chart, Batteries – LiftMaster LA500 Residential / Light Commercial Swing Gate Operator User Manual

Page 41

Advertising
background image

39

NOTES:
• Severe or high cycle usage will require more frequent maintenance checks.
• It is suggested that while at the site voltage readings be taken at the operator.

Using a digital voltmeter, verify that the incoming voltage to the operator is

within ten percent of the operator’s rating.

Disconnect all power (AC, solar, battery) to the operator before servicing. The operator's AC Power switch ONLY turns off AC power to the control board and

DOES NOT turn off battery power. ALWAYS disconnect the batteries to service the operator.

MAINTENANCE CHART + BATTERIES

MAINTENANCE

MAINTENANCE CHART

DESCRIPTION

TASK

CHECK AT LEAST ONCE EVERY

MONTH

6 MONTHS

3 YEARS

Entrapment Protection Devices

Check and test for proper operation

X

Warning Signs

Make sure they are present

X

Manual Release

Check and test for proper operation

X

Gate

Inspect for wear or damage

X

Accessories

Check all for proper operation

X

Electrical

Inspect all wire connections

X

Mounting Hardware

Check for tightness

X

Operator

Inspect for wear or damage

X

Batteries

Replace

X

BATTERIES

Batteries will degrade over time depending on temperature and usage. The operator

alarm will beep 3 times with a command if the battery is low. Batteries do not

perform well in extremely cold temperatures. For best performance, the batteries

should be replaced every 3 years. Use only LiftMaster part 29-NP712 for

replacement batteries. The standard control box comes with two 7AH batteries.
Two 33AH (A12330SGLPK) may be used in place of the 7AH batteries for a Large

Metal Control Box solar installation. A battery tray (model K10-36183) and battery

harness (model LA500SLRHARN) are required for 33AH applications.
The batteries contain lead and need to be disposed of properly.

Advertising