DUAL GATES ONLY

DUAL GATES ONLY

WIRING

Before digging, contact local underground utility locating companies. The

following items are required to complete the junction box installation:

• 4 x 4 Junction Box with 3/4" NPT threaded port holes

Screws

• PVC Conduit

1

Trench across driveway to bury the extension cable. Use PVC conduit to

prevent damage to cables.

2

Open the junction box by removing screws (4) and set aside.

3

Mount the junction box within 3 feet (0.9 m) of second operator.

4

Route operator cable and extension cable through watertight connector

nut and watertight connector.

5

Insert cables and watertight connectors into the holes in the bottom of the

junction box (not provided).

6

Feed extension cable through PVC conduit and secure with nut.

INSTALL THE EXTENSION CABLE AND JUNCTION BOX

!

!

PVC Conduit

Junction Box

Extension Cable

Operator Cable

Within

3 feet

1

Insert wires from extension cable and operator cable into the terminal

block connector as shown (like-colored wires must face each other).

2

Put wires inside of junction box.

3

Secure operator and extension cables with watertight connector nut.

4

Reinstall cover.

WIRE THE EXTENSION CABLE TO THE SECONDARY OPERATOR

Terminal Block Connector

Extension Cable

Operator Cable