APC UCCS Temperature Control User Manual

Page 40

Advertising
background image

JANUARY

2008

UCCS

STANDARDS

15950-40

G. System logs, trend logs, and event-initiated logs shall be set up to provide historical and

real-time monitoring of system operation. Logs shall be grouped by equipment.

H. Safety Shutdowns - Boilers and Chiller: Boilers and/or chiller will be provided with all

required safety controls as specified in Division 15. Safety trip shall shut down respective

boiler or chiller directly and shall be annunciated at the Central Work Station.

I. Safety Shutdowns - General: All safety shutdowns of electrical equipment shall be hard-

wired. All shutdowns shall occur directly through interconnection of contacts on the safety

device with the controlling circuit of the electrical equipment. Safety shutdowns through

software are not acceptable. Interposing relays may be used only with prior approval of

the Engineer and Owner's Representative when no alternative exists.

J. This Contractor shall notify the University two weeks in advance of when connection to the

BAS network will be beneficial to the system so the work can be scheduled.

3.13 WORKSTATION PROGRAMMING

A. The University has multiple workstations networked across the campus. The main file

server is located in the Facilities HVAC office in the Stadium Building. All graphics,

alarms, trend logs, and schedules shall be accessible from any workstation and be fully

integrated with existing menus.

B. Graphics:

1. The system shall be programmed by the Controls Contractor to provide a color

graphic for:

a. Opening screen graphic showing the building, campus, facility, etc.

b. Each HVAC air and water system monitored or controlled

c. Each floor and zone controlled (floor plan) - both HVAC and smoke detectors

where applicable

d. Each VAV box with DDC controls

e. Each electrical subsystem monitored or controlled

f. Each prime mover subsystem (boilers, chillers, heat exchangers, pumps, towers,

and distribution system)

g. Each time-scheduling program

h. Utility consumption and outdoor condition logs

i. Fuel oil and generator systems