APC UCCS Temperature Control User Manual

Page 42

Advertising
background image

JANUARY

2008

UCCS

STANDARDS

15950-42

temperature controls contractor. The contractor shall confirm that the communication
network linking controllers within the [Add building name] functions properly, before

connecting the new controllers to the campus network.

3.15 DDC SOFTWARE

A. Provide sufficient internal memory for the specified control sequences and logging. There

shall be a minimum of 15% of available memory free for future use.

END OF SECTION

Advertising