5 installation of zr40h automatic calibration unit, 1 installation location, 2 mounting of zr40h automatic calibration unit – Yokogawa Integral Oxygen Analyzer ZR202 User Manual

Page 57: Installation location -11, Mounting of zr40h automatic calibration unit -11

Advertising
background image

<3. Installation>

3-11

IM 11M12A01-02E

8th Edition : Jan.13,2012-00

3.5

Installation of ZR40H Automatic Calibration

Unit

3.5.1

Installation Location

The following should be taken into consideration:
(1) Easy access to the unit for checking and maintenance work.
(2) Near to the detector or the converter
(3) No corrosive gas.
(4) An ambient temperature of not more than 55 °C and little change of temperature.
(5) No vibration.
(6) Little exposure to rays of the sun or rain.

3.5.2

Mounting of ZR40H Automatic Calibration Unit

The automatic calibration unit can be mounted either on a pipe (nominal JIS 50 A ) or on a wall.

It should be positioned vertically so that the flowmeter works correctly.
<Pipe Mounting>
(1) Prepare a vertical pipe of sufficient strength (nominal JIS 50A: O.D. 60.5 mm) for mounting of

automatic calibration unit. (The unit weights approximately 3.5 kg.)
(2) Mount the automatic calibration unit on the pipe by tightening the nuts with the U-bolt so that

the metal fitting is firmly attached to the pipe.

Figure 3.15 Pipe Mounting

<Wall Mounting>
(1) Make a hole in the wall as illustrated in Figure 3.16.

223

140

F3-13E.ai

4 - Φ6.5 hole, or M6 screw

Unit : mm

Figure 3.16 Mounting holes