Yokogawa Integral Oxygen Analyzer ZR202 User Manual

Page 3

Advertising
background image

ii

IM 11M12A01-04E

<Introduction>

This manual consists of twelve chapters. Please refer to the reference chapters for installation, opera-

tion and maintenance.

Chapter

Outline

Relates to

Installation Operation Maintenance

1. Overview

Equipment models and system configuration

examples

2. Specifications

Standard specification, model code (or part number),

dimension drawing for each equipment

3. Installation

Installation method for each equipment

4. Piping

Examples of piping in three standard system

configurations

5. Wiring

Wiring procedures such as “Power supply wiring”,

“output signal wiring” or others

6. Components

Major parts and functions are described

7. Startup

Basic procedure to start operation of EXAxt ZR.

Chapter 7enables you to operate the equipment

immediately.

8. Detailed Data

Setting

Details of key operations and displays

9. Calibration

Describes the calibration procedure required in the

course of operation.

10. Other

Functions

Other functions described

11. Inspection

and

Maintenance

How to conduct maintenance of EXAxt ZR and

procedures for replacement of deteriorated parts

12. Troubleshoot-

ing

This chapter describes measures to be taken when an

abnormal condition occurs.

CMPL (parts list)

User replaceable parts list

: Read and completely understand before operating the equipment.
: Read before operating the equipment, and refer to it whenever necessary.

: Recommended to read at least once.

Advertising