Seed Hawk Raven 2011 User Manual

Page 138

Advertising
background image

Chapter 6

128

Seed Hawk™ Viper Pro™ Installation & Operation Manual

4.

Select which products to chain together and then set the sequence in which the products will be used.

Note:

The product chaining feature is not available with ground drive SCT Ready systems. For more
information on the SCT Ready system, see SCT Ready Setup section on page 132.

5.

Press Next. The Product Chain Setup - Product Advance Settings screen displays.

6.

Select the Enable Auto Advance and Advance on Bin Level Sensor Alarm option to allow the Viper Pro
to automatically switch to the next product in a product chain when the bin level sensor alarm is activated.

Note:

If ‘Enable Auto Advance’ is not set, the products WILL NOT advance automatically. Products
monitored by air cart bin level sensors will advance when the bin level sensor reads 5% bin height
remaining.

Be sure that the bin level sensor is properly connected and calibrated for all products set to
advance on a bin level sensor alarm.

7.

Press Next. The final Product Chain Setup screen displays.

8.

This screen sets the product information and assigns any variable rate information for the chained product
group. Touch the Next button to continue setting up independent or un-chained products. For more
information on product setup and the rest of the job setup, refer to the

Starting a New Job section on

page 117.

Advertising