Below-the-lid with knuckles installation kit – Badger Meter ORION Classic (CE) User Manual

Page 18

Advertising
background image

ORION® Water Endpoints

Below-the-Lid with Knuckles Installation Kit

For below the lid installations, a special Below-the-Lid with Knuckles Installation Kit (64394-003) with mounting bracket

(

Figure 8

) is available . This mounting support bracket is designed for use with a 3/8, 5/8 and 1/2 inch rebar or 1/2 inch

schedule 40 PVC pipe .

Figure 8: Pit support bracket (knuckles) - top view

To install an ORION endpoint below a meter pit lid, follow these steps and refer to

Figure 9

.

1 . Drive rebar or stake into the ground .

DRIVE REBAR OR STAKE INTO THE GROUND PRIOR TO ATTACHING THE ENDPOINT TO AVOID DAMAGE.

2 . Once in the ground, secure the mounting bracket on the appropriate rebar or pipe using the enclosed washer, wing

nut and hex head bolt provided with the bracket .

3 . Insert the endpoint through the bottom of the bracket and thread the lock nut onto the top of the endpoint . For best

results, mount the endpoint a maximum of one to two inches below the underside of the lid .

Figure 9: Pit ORION beneath lid installation

5/8" Rebar

Support bracket

#6-32 wing nut

#6 washer

#6-32 x 3/4
hex head bolt

Hex head bolt can be placed
in any slot depending upon
the type of support used

1/2" schedule 40 PVC pipe

1/2" Rebar

3/8" Rebar

Meter pit lid

Lock nut

ORION

endpoint

1/2" schedule 40 PVC pipe

Clamp

Page 18

June 2014