Chapter 3: Installation

36 of 116

Chapter 3: Installation

3-1 Uncrating the Equipment

Batch Blenders are shipped mounted on a skid, enclosed in a plastic wrapper, and contained
in a crate.

1. Remove crate from around blender.

2. Secure strap of proper lifting capacity to both lifting lugs (See Figure 20 below.).


Use approved safety straps or chains to lift the blender at the marked lifting points.

3. Lift blender until strap is taut.

4. Remove bolts attaching bottom of blender to shipping skid, bolt located under mixer

drawer.

5. Lower blender slowly.

Figure 20: Blender Lifting Lugs (1 on each side)

3-2 Mechanical Installation

It is the intent of this section to familiarize the reader with the proper site requirements and
installation procedures of the Batch blending system. The information in this section is NOT
meant to replace or supersede an established local or company implemented procedures. It is
meant to enhance them.

The installation procedure should be used as a general guideline for the proper installation
steps required to install the Batch blending system.

1. Lift blender and position over machine throat or floor stand.

2. Set in position and secure by tightening four grade 8 bolts. (Supplied by customer.)