Chapter 5: Maintenance

76 of 116

Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

The mechanical design of the blender is very simple and very little maintenance is required.
The only moving parts are the metering gates, weigh hopper dump valve, and mixer agitator.
The checklist below contains a list of items which should be inspected and/or replaced to
keep your blender operating at peak efficiency. Perform each inspection at the regular
intervals listed below.

Figure 52: Sample Preventative Maintenance Schedule

System model #

Serial #

Daily

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Inspect blender for
any loose parts-
tighten them
immediately.

Verify quality of
compressed air
supply.

Verify mixer door is
properly latched.

Every week

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Inspect metering
gates for proper
operation.

Check to make
sure that all hose
connections are air
tight.

Every month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Inspect air regulator
and air safety
circuits, if equipped.

Recalibrate blender
only If necessary.

Photocopy this page for your maintenance records

Advertising