Important – Allied Air Enterprises 80G1UH User Manual

Page 13

Advertising
background image

506526-01

Page 13 of 39

Issue 1031

Venting

A 4 inch diameter flue transition is factory installed on the

combustion air inducer outlet of all models. Figure 16 shows

the combustion air inducer as shipped from the factory.

Mounting Screws Location

Figure 15

UPFLOW POSITION

Top Vent Discharge

Figure 16

The unit will not vent properly with the flue transition

pointed down in the 6 o’clock position.

The combustion air inducer may be rotated clockwise

or counterclockwise by 90° to allow for top or side vent

discharge in all applications. When the unit is installed,

the flue transition must be in the 9 o’clock, 12 o’clock or

3 o’clock position.

IMPORTANT

Figure 17

If necessary reposition the combustion air inducer, pressure

switch and/or make-up box as needed per the following

steps. See Figures 16 through 22.

1. Remove the four mounting screws (Figure 15) which

secure the combustion air inducer / pressure switch

assembly to the orifice plate. Lift the assembly and rotate it

90° clockwise or counter clockwise to either the 3 o’clock

position. Resecure with four secrews. Gasket should be

left in place.

2. Use tin snips to cut preferred opening on the cabinet for

repositioning the flue outlet. Use the cut-out piece as a cover

plate to patch unused opening on cabinet.

Figure 18

UPFLOW POSITION

Right Side Vent Discharge

Pressure switch tubing may be too long. Cut to fit, then reattach to barbed

fitting on pressure switch. Tubing must not be allowed to sag.

Remove make-up box assembly (2 screws) and cut wire tie to free make-

up box wires. Re install make-up box on other side of cabinet.

Resecure make-up box wires: Either pull excess wires through the blower

companrtment and secure using supplied wire tie, or coil excess wire and

secure to the gas manifold.

UPFLOW POSITION

Left Side Vent Discharge