Heating Sequence Of Operation (Figure 36)

1. When thermostat calls for heat, combustion air blower

starts.

2. Combustion air pressure switch proves blower operation.

Switch is factory set and requires no adjustment.

3. After a 15 second prepurge, the hot surface ignitor

energizes.

4. After a 20 second ignitor warm-up period, the gas valve

solenoid opens. A 4 second trial for ignition period

begins.

5. Gas is ignited, flame sensor proves the flame, and the

combustion process continues.

6. If flame is not detected after first ignition trial, the ignition

control will repeat steps 3 and 4 four more times before

locking out the gas valve. The ignition control will then

automatically repeat steps 1 through 6 after 60 minutes.

7. To interrupt the 60 minute, move thermostat from “Heat”

to “OFF” then back to “Heat.” Heating sequence then

restarts at step 1.

Gas Pressure Adjustment

Gas Flow (Approximate)

Table 10

Furnace should operate at least 5 minutes before checking

gas flow. Determine time in seconds for two revolutions of

gas through the meter. (Two revolutions assures a more

accurate time.) Divide by two and compare to time in Table

10 below. If manifold pressure matches Table 12 and rate

is incorrect, check gas orifices for proper size and restriction.

Remove temporary gas meter if installed.

NOTE: To obtain accurate reading, shut off all other gas

appliances connected to meter.

Supply Pressure Measurement

A threaded plug on the inlet side of the gas valve provides

access to the supply pressure tap. Remove the threaded

plug, install a field provided barbed fitting and connect a

manometer to measure supply pressure. See Table 12 for

proper line pressure. Replace the threaded plug after

measurements have been taken.

Manifold Pressure Measurement

1. Remove the threaded plug from the outlet side of the

gas valve and install a field provided barbed fitting.

Connect to a manometer to measure manifold pressure.

2. Start unit and allow 5 minutes for unit to reach steady

state.

3. While waiting for the unit to stabilize, observe the flame.

Flame should be stable and should not lift from burner.

Natural gas should burn blue.

4. After allowing unit to stabilize for 5 minutes, record

manifold pressure and compare to value given in Table

12.

NOTE: Shut unit off and remove manometer as soon as an

accurate reading has been obtained. Take care to remove

barbed fitting and replace threaded plug.

Proper Combustion

Furnace should operate a minimum 15 minutes with correct

manifold pressure and gas flow rate before checking

combustion. Take combustion sample beyond the flue out

let and compare to the tables below. The maximum carbon
monoxide reading should not exceed 50 ppm.

Table 11

INTEGRATED IGNITION CONTROL

Blower on time will be 45 seconds after gas valve is energized. Blower off time will depend on “OFF TIME” Setting.