About installation and cabling, Verifying the on-site checklist – Avaya S8300 User Manual

Page 99

Advertising
background image

About installation and cabling

Issue 9.1 June 2006

99

About installation and cabling

The Avaya G700 Media Gateways can be installed in a variety of configurations:

As a standalone unit with one G700

With multiple G700 Media Gateways in a stack

In combinations of Media Gateways and Avaya C360 family devices (see

Building a

stack

on page 89).

Up to ten G700 Media Gateways and/or Avaya C360 devices can be combined in a single
stack. The G700s can be controlled by an Avaya S8300, S8400, S8500, or S8700/S8710 Media
Server.

In a typical installation, you arrive at the site equipped with all the tools and information needed
to install a G700 and, possibly, an S8300.

In this section, you complete the following procedures:

Verifying the on-site checklist

on page 99

Verifying Environmental conditions

on page 100

Unpacking and checking the order

on page 101

Installing the G700 media gateway

on page 101

Cabling multiple units

on page 112

Attaching Ground Conductors

on page 116

Note:

Note:

When installing a G700, complete all tasks in this chapter to install the gateway
before doing the media server administration (for example, add
media-gateway

).

Verifying the on-site checklist

When you reach the customer's site, verify each item on the Installer’s Checklist (see

Appendix

B: Information checklists

.)

Tip:

Tip:

It is recommended that you consult with the customer network manager for IP
and DNS addressing, as well as for testing the installation.

Also, before proceeding with the installation, you should verify that the proper environmental
and safety conditions exist.

Advertising
This manual is related to the following products: