Bunn G9-2T DBC User Manual

Page 12

Advertising
background image

12

Begin each grind cycle by visually

inspecting the hopper(s) for ample

supplies of whole bean coffee.

Foreign materials must not block

the openings at the bottom of the

hopper(s).

Refer to Service - Solenoids for test-

ing procedures.

Refer to Service - Timer for testing

procedures.

Refer to Service - Off/On/Start

switch for testing procedures.

(A) Check to see that the slide plates

move freely to allow beans to travel

into the grind chamber.

(B) Refer to Service -Slide Plates for

testing procedures.

Refer to Service - Solenoids for test-

ing procedures.

Refer to Service - Solenoids for test-

ing procedures.

Remove both black fillister head

screws holding the grinder selector

dial plate to the grinder. Carefully

remove the dial plate and rotor cup.

Inspect the shear plate for wear.

Replace if excessively worn or dam-

aged.

Refer to the Adjustment section

in the Installation and Operation

Manual.

Refer to Service - Snubber for re-

placement procedures.

1. Hopper(s)

2. Blockage of hopper(s)

3. Slide Gate Solenoids (Model LPG-

2E only)

4. Timer

5. Off/On/Start switch

6. Slide plates

7. Solenoids

8. Solenoid Limit Thermostat

9. Shear Plate

1. Timer adjustment

2. Snubber

Grinder starts, but will not dispense

from hopper.

Incorrect amount of coffee.

Problem

Probable Cause

Remedy

41545 122209

Advertising
This manual is related to the following products: