Service (cont.) – Bunn G9-2T DBC User Manual

Page 23

Advertising
background image

23

SERVICE (Cont.)

1. Retaining Ring W/Hopper Gasket

2. Slide Plate, Solenoid Plunger and Spring

3. Spacer Plate

4. Mounting Ring, Solenoid and Solenoid Mounting

Plate

5. Setscrew, #8-32

6. Motor and Burr Housing

P1050

1

2

3

4

5

2

6

FIG. 11 SOLENOID AND GATES

8. Remove spacer plate (3) and set aside for reas-

sembly.

9. Lift solenoid bracket and solenoids (4) over the

motor and burr housing assembly (6) and set aside

for reassembly.

10. Remove the #8-32 setscrew (5) and set aside for

reassembly.

11. Lay motor on it’s side.

NOTE: Refer to Fig. 14 for the disassembly and assembly

of the burrs and rotor.

12. Remove the two #10-32 fillister head screw securing

burr housing cap (10) to the burr housing.

13. Remove cap, burr adjusting screw, decaffing plate

and decaffer support (10) as an assembly. Set aside

for reassembly.

14. Remove load disc (11) and set aside for reassem-

bly.

15. Slide rotor (12), lower burr (13) and spring (14)

as an assembly off the motor shaft, set aside for

reassembly.

16. Remove burr housing divider (8) and set aside for

reassembly.

NOTE: Inspect rotor. If rotor needs to be replaced,

remove the two #10-32 binding head screws securing

lower burr (13) to the rotor and remove burr. Install

lower burr (13) on new rotor (12) using two #10-32

binding head screws.

17. Slide spring retaining bushing (15) off the motor

shaft and set aside for reassembly.

18. Remove the two #10-32 binding head screws secur-

ing the upper burr (16) to the motor and housing

assembly (17).

19. Remove the upper burr (16) and set aside for reas-

sembly.

NOTE: If burrs need to be replaced, they must be re-

placed in matched pairs.

MOTOR (Models LPG & FPG)

41545 122209

Advertising
This manual is related to the following products: