Service (cont.) – Bunn G9-2T DBC User Manual

Page 36

Advertising
background image

36

SERVICE (Cont.)

FIG 32 BATCH SELECTOR SWITCH

Location:

The batch selector switch is located on the left front

of the hopper housing.

Test Procedure:

1. Disconnect the grinder from the power source.

2. Open hopper lid and loosen four screws inside the

hopper and remove hopper.

3. The ORN wire is connected to the common terminal

"a" on the rear of the switch.

4. The TAN wire for the SMALL selection is connected

to terminal 1, the GRY wire for the MEDIUM selec-

tion is connected to terminal 2, the PNK wire for

the LARGE selection is connected to terminal 3.

5. Remove all wires from the switch terminals.

6. Set the switch in the SMALL position. Check for

continuity between terminal "a" and terminal 1.

7. Set the switch in the MEDIUM position. Check for

continuity between terminal "a" and terminal 2.

8. Set the switch in the LARGE position. Check for

continuity between terminal "a" and terminal 3.

P787

FIG 33 BATCH SELECTOR SWITCH TERMINALS

Batch Selector Switch (Model FPG)

P2947

TAN to POTENTIOMETER

GRY to POTENTIOMETER

PNK to POTENTIOMETER

ORN to TIMER

If continuity is present at all positions, the switch is

operating properly.

If continuity is not present at any position, replace the

switch.

9. Refer to the Fig. 33 when reconnecting wires.

Removal and Replacement:

1. Disconnect the grinder from the power source.

2. Remove the four 8-32 screws attaching the rear

access panel and move aside.

3. Remove all wires from the batch selector switch

terminals.

4. Loosen the setscrew on the switch knob and remove

the knob.

5. Remove the nut and lockwasher attaching the switch

to the hopper housing.

6. Remove the 6-32 screw attaching the switch to the

hopper housing.

7. Remove and discard the old switch.

8. Refer to Fig 33 when reconnecting wires.

41545 122209

Advertising
This manual is related to the following products: