6 second boom section installation, Second boom section installation – SkyTrak 6036 Service Manual User Manual

Page 65

Advertising
background image

3-23

6036, 6042, 8042, 10042, 10054

Boom

17. Inside the rear of the boom, slide the threaded clevis

end (10) of the retract chain down the right side of
the boom. Guide the threaded part of the clevis out
through the hole in the tab on the bottom of the
boom. Pull threaded part of clevis all the way
through tab.

18. Coat the entire threaded portion of the clevis with

multi-purpose grease. Install a flat washer and
locknut onto the clevis. Thread the nut onto the
clevis until the threads are flush with the top of the
nut.

19. Install the bottom wear pads to the first boom section

with the previously used hardware.

3.6.6

Second Boom Section Installation

1. At the rear of the second boom section, assemble

the retract chain sheave to the mounting ears on the
right side of the boom. Place the sheave between
the ears and insert the sheave pin (11) from the left

side. Align the hole in the pin retainer plate with the
threaded hole in the left ear. Secure the pin.

2. Apply grease to the grease fitting in the pin. Spin the

sheave by hand to ensure the sheave spins freely on
the pin and to distribute grease evenly.

3. Install the hose reel assembly (12), left side and

bottom wear pads to the rear of the second boom
section.

4. Install the boom side and top wear pads of the

second boom section.

5. Grease the sections of the boom in areas where the

wear pads will slide.

6. Before installing the second boom section into the

first boom section, place a string (heavy enough to
pull the Attachment Tilt and Auxiliary hydraulic
hoses) down the inside of the boom. Allow the string
to hang out the rear of the boom. Pull the other end
out the opening on the left side of the boom where
the hoses will exit the boom. Position the strings all
the way to the left side of the first boom section.

7. Using a suitable sling, carefully slide the second

boom section into the first boom section. Leave
enough room at the front of the boom to install the
center wear pad.

MH1461

10

MH2261

11

MH1501

12

Advertising
This manual is related to the following products: