GeneRal InfoRMaTIon

Many methods and procedures are in use for erecting the structural portion of metal buildings .
The techniques of raising frames vary from erecting small clear spans and endwall frames in units
to erecting the larger clear spans and modular frames in sections . The erection methods used
depend strictly on the type of building, the available equipment, the experience level of the crews,
and the individual job conditions .

The variations in these factors preclude the establishment of a firm or specific set of erection
rules and procedures . Consequently, the erection operation must be tailored by the erector to fit
individual conditions and requirements . However, there are certain erection practices, pertaining to
structural members, which are in general use and have proven sound over the years . Descriptions
of these follow .

Erectors are cautioned not to cut primary members (rigid frame columns, rafters, end bearing
frame rafters, interior columns) . These are the primary support members for the frame and
are designed as such . Any cutting of these members may affect the structural stability . A
representative of Mueller’s must be consulted prior to attempting alterations of these members .

noTe: Do not install any material if its quality is in question. Mueller, Inc.

will not be responsible for costs incurred associated with the installation

and/or removal of same.

WaRnInG! In no case should building erection be started on green concrete.

anchor bolts may pull loose, concrete spall (chip out along edges) may occur

and equipment may crush or crack slab. consult the project engineer, not

Mueller, Inc. on foundation questions.