After the columns have been erected, the ground-assembled rafter is hoisted into place and
connected to the columns . The size of the rafter that can be safely handled depends on
the equipment available and the experience of the erection foreman .

Generally as many

connections as possible are made on the ground.

The flange brace should be bolted to the rafter prior to raising in order to save time .

The hoisting

equipment should never be released from the rafter until the frame is adequately braced,
so it cannot buckle or tip in the longitudinal direction of the building.

noTe: Drawing above is intended as a general rigging method.

actual rigging method will vary with member configuration.

Flange braces

loose bolted