Roof InsUlaTIon (conTInUeD)

Seal insulation sidelap joints by lapping 4” tab side . As on the walls, the general sequence is to
install the roof sheets in conjunction with the insulation .

Eave Trim

Blanket

Insulation

Eave Strut

Double-sided Tape

4' -0"

1' -0"

First Roof

Panel

noTe: The insulation sidelap must be lapped to prevent condensation and

minimize temperature loss at laps.

WaRnInG! Wipe oil and other slippery substances from roof panels. Do not step

on rib of panel, near a crease in the panel, near a side edge or within five feet of

the end of unsecured panel. Insulation has no load bearing strength. Maintain

body weight on scaffold or walk boards.