Roof insulation (continued) – Mueller Pre-Fab User Manual

Page 42

Advertising
background image

877-2-MUELLER

D-4

Roof InsUlaTIon (conTInUeD)

Double sided tape or contact adhesives can be used to hold insulation in place while the roof
sheets are being installed . Trim excess insulation to the edge of the eave trim and cut fiberglass
approximately 4 inches from end leaving only facing . Fold facing over end of blanket insulation to
seal the end .

Cut Fiberglass from Vapor Barrier

and Fold Vapor Barrier Over

Blanket

Insulation

Double-sided

Tape

#12 Self-Drilling

Wall Fastener

Allow room to

install sealant tape

and closure strip

Eave Trim

(Trim shape

may vary)

Eave Strut

Outside Closure

(Optional)

noTe: Do not install more insulation on the roof than can be covered by roof

panels before the work period ends. Do not allow the insulation to become wet.

Advertising