Preparing the eave – Mueller Pre-Fab User Manual

Page 56

Advertising
background image

877-2-MUELLER

E-10

PRePaRInG THe eave

After installing the first run of insulation, prepare the eave for the first roof panel by applying
sealant tape along the eave outside of the insulation and leaving release paper in place . Sealant
must be applied in a straight line and without voids . Do not stretch the sealant . Use a knife to cut
if necessary . Cut an inside closure strip as shown and place starter piece on top of the sealant
(removing protective paper from the sealant only as required) . Center the first major rib with edge
of the endwall frame . Splice a full closure to the starting closure and apply along the top of the
eave sealant . If roof is subject to ice and snow build-up, the splice in the closure strip must be
caulked to ensure weathertightness .

Wall Panel

Full Inside Closure

Align with Roof Line

Cut Closure Here

Eave Flashing

Blanket

Insulation

Starter

Panel

Edge

Eave

Strut

Double-sided Tape

Cut

One Half

Inside Closure

4'- 0"

1'- 0"

1'- 0"

noTe: Insulation has no laod bearing strength. Maintain body weight on

approved scaffolding or walk boards.

Advertising