R” panel – Mueller Pre-Fab User Manual

Page 60

Advertising
background image

877-2-MUELLER

E-14

“R” Panel

sidelap

1 . Sealant tape must be installed between weather infiltration point and fastener .

2 . Install Lap Tek fasteners at 20” on center .

3 . When possible, install panels such that sidelaps are nested away from prevailing winds .

endlap

1 . Double bead sealant tape must be installed between weather infiltration point and fastener .

2 . Install self-drilling fasteners on each side of major ribs of panel (two fasteners per foot) .

Detail A

Detail B

Lap Tek Screw

(20" O.C.)

Sealant Tape

Sealant Tape

Sealant Tape

Self Drill

(6 each

per panel)

12"

R Panel

Endlap Attachment

(See Detail A)

Sidelap Attachment

(See Detail B)

R Panel

Intermediate Purlin

Attachment

(3 Fasteners Per Panel)

High Side Attachment

(6 Fasteners Per Panel)

Eave Attachment

(6 Fasteners Per Panel)

Slope