2 wear pads, Main boom, 3 wire rope – JLG 660SJ Service Manual User Manual

Page 174: Inspection, Wear pads -2, Main boom -2, Wire rope -2, Inspection -2, Location and thickness of wear pads -2, 2 wear pads main boom

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-2

– JLG Lift –

3121202

4.2 WEAR PADS

Main Boom

1. Shim up wear pads to within 1/32 inch (.79 mm) tol-

erance between wear pad and adjacent surface.

2. Replace wear pads when worn within 1/16 inch (1.59

mm) and 1/8 inch (3.18 mm) - B, C, D of threaded
insert. See Location and Thickness Of Wear Pads.

3. Adjusting wear pads, removing or adding shims,

bolt length must also be changed.

a. When adding shims, longer bolts must be used

to ensure proper thread engagement in insert.

b. When shims are removed, shorter bolts must be

used so bolt does not protrude from insert and
come into contact with boom surface.

4.3 WIRE ROPE

Each day before using the machine:

1. Raise the main boom to approximately horizontal.

2. Extend and retract the boom sections.

3. Check for delayed movement of the fly section,

which indicates loose wire ropes.

Inspection

NOTE: The pictures in this paragraph are just samples to

show the replacement criteria of the rope.

1. Inspect ropes for broken wires, particularly valley

wire breaks and breaks at end terminations.

2. Inspect ropes for corrosion.

3. Inspect ropes for kinks or abuse.

4. Inspect sheaves for condition of bearings/pins. (See

Dimension Of Sheaves for proper dimension.)

5. Inspect sheaves for condition of flanges. (See

Dimension Of Sheaves for proper dimension.)

Figure 4-3. Location and Thickness of Wear Pads

Flexing a wire rope can often expose broken wires

hidden in valleys between strands.

A kink is caused by pulling down a loop

in a slack line during improper handling,

installation, or operation.

Advertising
This manual is related to the following products: