Cover sub-assembly, Main assembly, Integral brake check – JLG 660SJ Service Manual User Manual

Page 64

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-14

– JLG Lift –

3121202

Cover Sub-Assembly

1. Grease O-Ring (6E) and insert into internal groove in

Cover (6A).

2. Assemble Disengage Cap (6B) onto Cover (6A)

using two Hex Head Bolts (6C). Torque bolts to 70-
80 in-lbs.

3. Insert Disengage Rod (6D) into hole in Cover (6A)

until it touches the inside of the Disengage Cap (6B).

NOTE: The Disengage Rod can be inserted either end first.

4. Grease Face of Thrust Washer (2) and place in

Cover (6A) making sure that tangs on washer seat
into pockets in cover.

5. Install O-Ring Pipe Plugs (6F) into Cover (6A). The

plugs should be hand tight.

Main Assembly

NOTE: All components should receive a generous amount

of lubricant oil as they are being assembled.

1. Place Hub-Spindle Sub-Assembly on the bench.

2. Grease O-Ring (18) and place it into groove of Hub

(1D).

3. Place Ring Gear (1E) onto Hub (1D). Align the three

shipping Cap Screw Holes on Hub (1D) and Ring
Gear (1E).

4. Install three shipping Cap Screws (19) into ring gear

and hub. Torque them to 15-20 ft-lbs.

5. Place External Retaining Ring (5) over 13T spline to

the retaining groove on Input Shaft (9).

NOTE: For ratio 48:1, assemble Output Sun Gear (11) over

Input Shaft (9) first, then install External Retaining
Ring (5).

6. Using appropriate tool to install Retaining Ring (20)

into groove on Output Sun (11).

7. Place Input Shaft (9) spline end into mesh with Inter-

nal Coupling (7) splines.

8. With the modified spline end facing up, place the

Output Gear (11) into mesh with the planet gears
from the Hub-Spindle Sub-Assembly.

9. Place Input Carrier Sub-Assembly (3A) onto Output

Sun Gear (11) splines. Drop Input Sun (10) into
mesh with planet gears for specific ratios, if
required. (No timing required).

10. Grease O-Ring (17) and insert into groove in Cover

Sub-Assembly (6).

11. Install Cover Sub-Assembly (6) into Ring Gear (1E)

counterbore and install Retaining Ring (6G) into
groove in Ring Gear (1E).

12. Attach ID Tag (15) onto unit using Drive Screws (16).

13. Check disconnect, roll and air check unit, leak check

brake, and record release pressure.

14. Insert Plastic Plug (12) into place if applicable.

Integral Brake Check

1. Using appropriate fittings, connect hydraulic line

from hand pump to brake port.

2. Check to see that brake is set by trying to rotate

Input Shaft (9). This can be accomplished by install-
ing an appropriate tool (any tool that can locate on
the splines of the Input Coupling (7), such as a mat-
ing splined shaft) into Input Coupling (7).

3. Bleed brake. Increase hydraulic pressure gradually

while trying to rotate the input until brake just starts
to release. Note this pressure. Make sure the pres-
sure falls into the appropriate range below.

4. Increase pressure to 1,000 psi and hold for 30 sec-

onds to check for leaks. Repair leaks if necessary.

NOTE: Make sure that brake re-engages when pressure is

released.

NOTE: When done, make sure Input Coupling (7) is cen-

tered in Spindle (1A) to make installation of motor
possible without release of brake.

BRAKE

CODE

JUST RELEASE

PRESSURE RANGE

PSI

BAR

A

200-260

13.7-17.9

B

170-220

11.7-15.1

C

140-185

9.6-12.7

D

130-155

8.9-10.6

E

115-145

7.9-9.9

Advertising
This manual is related to the following products: