Boom assembly cutaway - sheet 3 of 3 -8, Disassembly of sheave assembly -8 – JLG 660SJ Service Manual User Manual

Page 180

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-8

– JLG Lift –

3121202

8. Carefully remove the telescope cylinder and sheave

assembly. Place telescope cylinder on a suitable
trestle.

a. Remove hardware from the wear pads; remove

wear pads from cylinder.

b. Remove hardware from the wire rope guard;

remove guard from cylinder.

c. Remove hardware from the sheave pin; remove

pin and sheave from cylinder.

Figure 4-10. Boom Assembly Cutaway - Sheet 3 of 3

Figure 4-11. Disassembly of Sheave Assembly

Advertising
This manual is related to the following products: